HTO Tunel Ribnica – Kakanj
TTU energetik has implemented an important project for HTO Tunnel Ribnica near Kakanj, working for the client Ribnica Kakanj. The project includes the design, production and installation of a transport system that enables safe and efficient supply of materials through the tunnel section of the infrastructure.
Project characteristics:
-
The system is designed to work in challenging tunnel conditions – with high humidity, dust and limited space.
-
Customized conveyors and construction enable reliable operation with minimal interruptions.
-
High-quality materials and precise workmanship guarantee a long service life and wear resistance.
-
The entire implementation is accompanied by strict quality control, professional installation, and measures for the safety of users and equipment.








